POWERGRID Khetri Transmission System Limited

 

 

Sl.No Name of SPV Acq. date Details of Elements Project Status
1 POWERGRID Khetri Transmission System Limited 29.08.2019 a) Establishment of 765/400kV, 2x1500 MVA S/s at suitable location near Khetri with 765kV (2x240MVAR) and 400kV (1x125 MVAR) bus reactor Under implementation 
b) Khetri – Sikar (PG) 400kV D/c line (AL59)
c) 400kV line bays at Sikar (PG) for Khetri – Sikar (PG) 400kV D/c line (Twin AL59)
d) Khetri– Jhatikara 765kV D/c line
e) 765kV bays at Jhatikara for Khetri– Jhatikara 765kV D/c line
f) 1x240 MVAR Switchable Line reactors for each circuit at Jhatikara end of Khetri – Jhatikara 765kV D/c line along with reactor bays